TEX AT SITE

CALIBRATION & TECHNICAL SERVICES FOR CONSTRUCTION & CIVIL ENGINEERING

Supporting construction contractors, civil engineering teams and major infrastructure projects with accurate measurement, equipment testing, safety inspections, maintenance support and traceable technical records across mainland Australia.

Calibration and safety testing services supporting construction and civil engineering projects
BUILT AROUND THE PROJECT

SUPPORTING EQUIPMENT ACROSS CONSTRUCTION OPERATIONS

Construction and civil projects rely on measurement, electrical, mechanical and safety equipment across project sites, workshops, maintenance teams and field operations. Tex At Site helps organisations coordinate the calibration, testing and inspection requirements associated with those assets.

01
01

PROJECT & FIELD TEAMS

Support for measurement and test equipment used during installation, commissioning, verification and ongoing construction activity.

02

PLANT & MAINTENANCE

Calibration and technical support for instruments and tools used to maintain construction plant, equipment and supporting infrastructure.

03

CIVIL & INFRASTRUCTURE WORKS

Measurement and technical support for teams working across road, rail, utilities, structural and major civil engineering projects.

04

SAFETY & SITE COMPLIANCE

Inspection and testing support for selected safety equipment used by construction personnel working at height, lifting loads and operating around electrical hazards.

EQUIPMENT ACROSS THE PROJECT

TECHNICAL REQUIREMENTS ACROSS CONSTRUCTION SITES

Construction projects rely on a broad mix of measurement, mechanical, electrical and safety equipment. Different tools support plant maintenance, installation, commissioning, structural work and site safety throughout the project lifecycle.

01
01

ELECTRICAL TEST EQUIPMENT

Multimeters, clamp meters, insulation resistance testers, voltage testers and other electrical instruments used during installation, maintenance and fault finding.

02

TORQUE & FASTENING EQUIPMENT

Manual and powered torque tools used where controlled fastening is important to structural assembly, plant maintenance and mechanical installation.

03

PRESSURE & PROCESS INSTRUMENTS

Pressure gauges, transmitters and related measurement equipment used across construction plant, commissioning, hydraulic systems and infrastructure work.

04

DIMENSIONAL & VERIFICATION TOOLS

Calipers, micrometers and other measurement equipment used for dimensional checks, component verification and workshop inspection.

05

LIFTING & HEIGHT SAFETY EQUIPMENT

Inspection support for lifting gear, rigging, rope, strops, ladders and fall arrest equipment used across construction and civil project environments.

06

HIGH VOLTAGE SAFETY EQUIPMENT

Testing support for insulating gloves, sleeves, mats, blankets, operating sticks, portable earths and other selected high voltage safety equipment.

PLANNED SERVICE COORDINATION

SUPPORTING PROJECT & MAINTENANCE SCHEDULES

Construction equipment often moves between projects, crews and maintenance environments. Calibration or inspection requirements therefore need to be considered alongside project timing, equipment availability and site access.

Reviewing equipment lists in advance helps determine how suitable assets can be grouped and how technical work can fit around the wider project or maintenance program.

01
01

REVIEW

Identify equipment, service requirements and due dates.

02

COORDINATE

Group suitable assets around project access, maintenance and equipment availability.

03

SERVICE

Complete the agreed calibration, testing or inspection requirements.

04

RECORD

Maintain traceable technical information and equipment service history.

SUPPORT ACROSS THE PROJECT

TECHNICAL SUPPORT WHERE CONSTRUCTION EQUIPMENT IS USED

Construction assets may be spread across active project sites, workshops, depots and remote infrastructure works. Suitable mobile calibration, testing and inspection services can help reduce unnecessary equipment movement and simplify service coordination.

Equipment quantities, technical scope, site access and project timing can be reviewed together before attendance is planned.

SERVICE ENVIRONMENTS
01
01

Active construction sites

02

Plant & maintenance workshops

03

Civil infrastructure projects

04

Regional & remote works

VISIBILITY ACROSS PROJECT EQUIPMENT

TRACEABLE RECORDS FOR CONSTRUCTION ASSETS

Equipment can move between worksites, workshops and project teams throughout its service life. Clear records help maintenance and compliance personnel understand completed work, equipment history and upcoming service requirements.

01
CALIBRATION CERTIFICATES

Traceable documentation supporting completed calibration work and individual equipment records.

TEST & INSPECTION HISTORY

Maintain visibility over previous testing and safety inspection activity associated with relevant assets.

SERVICE SCHEDULING

Maintain clearer visibility over recurring equipment requirements and upcoming service dates.

PROJECT & AUDIT SUPPORT

Organised service information can simplify equipment reviews when project or audit records need to be checked.

CONSTRUCTION SERVICE QUESTIONS

CONSTRUCTION & CIVIL ENGINEERING FAQ

Yes. Where appropriate, calibration, testing and safety inspection requirements across different equipment categories can be reviewed together. Providing an equipment list beforehand helps determine the technical scope and most practical service approach.

Where practical, service requirements can be planned around site access, project timing, equipment availability and scheduled maintenance. Reviewing the scope in advance helps determine how suitable assets can be grouped.

Yes. Suitable calibration, testing and inspection work may be completed using Tex At Site's mobile service capability. Some equipment or specialised procedures may still require an appropriate laboratory environment.

Safety inspection requirements can include selected lifting gear, rigging, rope, strops, ladders and height safety or fall arrest equipment. The applicable inspection approach depends on the equipment and service requirements.

Completed work can be supported by traceable calibration, testing and inspection information, helping project, maintenance and compliance teams maintain visibility over serviced equipment and its history.

PLAN YOUR TECHNICAL REQUIREMENTS

DISCUSS YOUR CONSTRUCTION SERVICE PROGRAM

From individual instruments and safety equipment to coordinated calibration, testing and inspection requirements across larger project inventories, talk to the Tex At Site sales team about supporting your construction or civil engineering operation.

TALK TO OUR SALES TEAM

Request A Call Back

Your information will only be used to respond to your enquiry. We respect your privacy and will never share your details with third parties.

Upload Instrument List

South Australia

Please complete all fields before submitting your equipment list.

Upload Instrument List Western Australia

Please complete all fields before submitting your equipment list.

Upload Instrument List

ACT

Please complete all fields before submitting your equipment list.

Upload Instrument List

NEW SOUTH WALES

Please complete all fields before submitting your equipment list.

Upload Instrument List

VICTORIA

Please complete all fields before submitting your equipment list.

Upload Instrument List

NORTHERN TERRITORY

Please complete all fields before submitting your equipment list.

Upload Instrument lIST

QUEENSLAND

Please complete all fields before submitting your equipment list.